• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Online Courses
    • FHWA Safety Grant Products
    • Toolboxes
    • Flagger
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • About
  • Events
  • Contact
  • Search
Publication

A Multimodal Material Route Planning Problem Considering Key Processes at Work Zones

Author/Presenter: Wang, Youmiao; Song, Rui; Zhao, Ziqi; Zhao, Rixin; Zhang, Zheming
Abstract:

With the continuous development of large-scale engineering projects such as construction projects, relief support, and large-scale relocation in various countries, engineering logistics has attracted much attention. This paper addresses a multimodal material route planning problem (MMRPP), which considers the transportation of engineering material from suppliers to the work zones using multiple transport modes. Due to the overall relevance and technical complexity of engineering logistics, we introduce the key processes at work zones to generate a transport solution, which is more realistic for various real-life applications. We propose a multi-objective multimodal transport route planning model that minimizes the total transport cost and the total transport time. The model by using the ε − constraint method that transforms the objective function of minimizing total transportation cost into a constraint, resulting in obtaining pareto optimal solutions. This method makes up for the lack of existing research on the combination of both engineering logistics and multimodal transportation, after which the feasibility of the model and algorithm is verified by examples. The results show that the model solution with the introduction of the key processes at work zones produces more time-efficient and less time-consuming route planning results, and that the results obtained using the ε − constraint method are more reliable than the traditional methods for solving multi-objective planning problems and are more in line with the decision maker’s needs.

Source: PLoS One
Publication Date: June 6, 2024
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Mathematical Models; Routes and Routing; Transportation Operations; Work Zones

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute