• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Flagger
    • Online Courses
    • Toolboxes
    • FHWA Safety Grant Products
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • Events
  • About
  • Contact
  • Search
Publication

Advanced Notification Messages and Use of Sequential Portable Changeable Message Signs in Work Zones

Author/Presenter: Ullman, Gerald L.; Ullman, Brooke R.; Dudek, Conrad L.; Williams, Alicia; Pesti, Geza
Abstract:

In this report, researchers document the results of a laptop-based human factors study of alternative formats of presenting advance notice work zone information on portable changeable message signs (PCMSs) and a Texas Transportation Institute (TTI) driving simulator study of the ability of motorists to capture and process information on two PCMSs used in sequence to convey information about upcoming traffic situations. Based on the studies, researchers recommend that messages that require the display of calendar dates for future roadwork and other traffic control activities should utilize a message format consisting of the three-character abbreviation of the month (e.g., APR for April) in conjunction with the date. When future work activities span several days all in the same month, the month needs be noted only once in the message (i.e., APR 21-23) rather than repeating the month (i.e., APR 21-APR 23). The TTI driver simulator study results indicate the need to keep overall messages at or below the four-unit maximum recommended in existing guidelines. Researchers found that presenting five units of information on sequential PCMSs resulted in low comprehension rates, below what would be acceptable for highway applications. However, by keeping the message length to four units, it does appear that the use of sequential PCMSs will result in comprehension rates comparable to those obtained by presenting the same information at a single location on a large dynamic message sign (DMS), and is recommended as an acceptable formatting approach for TxDOT. Comprehension may be enhanced by repeating one of the units of information on both PCMSs.

Publisher: Texas Transportation Institute
Publication Date: July 2005
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Changeable Message Signs; Intelligent Transportation Systems; Work Zones

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute