How Long Should Repair Take?
Abstract:What’s a reasonable length of time to expect drivers to put up with closed lanes, milled surfaces with manholes sticking up, and the general inconvenience of repairing a street’ After a few calls to local agencies, small city and county street engineers primarily, the consensus seems to be that a short resurfacing project should be completed in two to three weeks at most. A major effort, including bridge and overpass widening or repair, may take much longer.
Source: Better Roads
Publication Date: December 2004
Topics: Highway Maintenance
Publication Date: December 2004
Notes:
Publication Types: News and Other Non-research Articles
The Clearinghouse has a copy of this item.
Topics: Highway Maintenance