• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Online Courses
    • FHWA Safety Grant Products
    • Toolboxes
    • Flagger
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • About
  • Events
  • Contact
  • Search
Publication

Modelling of Queue Length in Freeway Work Zones – Case Study Karaj-Tehran Freeway

Author/Presenter: Gilandeh, Mojtaba Mousazadeh; Ali, Sari Sharif; Goodarzi, Mohammad Javad; Amini, Nahid; Latifi, Hassan
Abstract:

In this study, the traffic parameters were collected from three work zones in Iran in order to evaluate the queue length in the work zones. The work zones were observed at peak and non-peak hours. The results showed that abrupt changes in Freeway Free Speed (FFS) and arrival flow rate caused shockwaves and created a bottleneck in that section of the freeway. In addition, acceleration reduction, abrupt change in the shockwave speed, abrupt change in the arrival flow rate and increase in the percentage of heavy vehicles have led to extreme queue lengths and delay. It has been found that using daily traffic data for scheduling the maintenance and rehabilitation projects could diminish the queue length and delay. Also, by determining the bypass for heavy vehicles, the delay can be significantly reduced; by more than three times. Finally, three models have been presented for estimating the queue length in freeway work zones. Moreover, the procedure shown for creating a queue length model can be used for similar freeways.

Source: Promet - Traffic and Transportation
Volume: 33
Issue: 1
Publication Date: January 31, 2021
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Commercial Vehicles; Mathematical Models; Traffic Queuing; Traffic Speed; Work Zones

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute