• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Online Courses
    • FHWA Safety Grant Products
    • Toolboxes
    • Flagger
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • About
  • Events
  • Contact
  • Search
Publication

Montana Supreme Court Denies Summary Judgment Where Pavement Dropoff in Construction Zone May Have Caused Motorcycle Crash

Abstract:

Plaintiff William Schmidt (Schmidt) was injured during a single vehicle motorcycle accident that occurred on an Interstate 90 ramp under construction at the DeSmet Interchange near Missoula, Montana. Schmidt filed a complaint in negligence in the Fourth Judicial District Court, Missoula County, against Defendant Washington Contractors Group, Inc. (Washington), the general contractor for the “DeSmet Interchange Project,” and Defendant Alpine Construction, Inc. (Alpine), the subcontractor hired to control traffic during the construction project. The District Court subsequently entered an opinion and order granting summary judgment in favor of Defendants Washington and Alpine. From this opinion and order, Schmidt appeals. We reverse and remand for further proceedings consistent with this Opinion.
Highway 93 and Interstate 90 intersect near Missoula, Montana, at a location called the DeSmet Interchange. The Montana Department of Transportation contracted with Washington to work as the general contractor for the DeSmet Interchange Project (the Project). As the general contractor, Washington was responsible for improving the overpass, on-ramps and off-ramps at the DeSmet Interchange during the spring and summer of 1995. Alpine, hired as subcontractor on the Project, was responsible for controlling traffic during the construction project which included posting signs. On August 21, 1995, Schmidt was injured when he crashed his motorcycle while descending a temporary entrance ramp to Interstate 90 at the DeSmet Interchange. While the top-half of this temporary ramp was paved, the bottom-half was only graveled. Additionally, where the ramp interfaced with Interstate 90, an elevation difference of approximately six to eight inches existed and the ramp was repaired almost daily due to wear and tear. Schmidt’s accident occurred at the bottom of the temporary ramp where the graveled portion interfaced with the paved interstate and the elevation differential existed.

Source: Road Injury Prevention & Litigation Journal
Publisher: TranSafety, Inc.
Publication Date: August 1999
Notes:

The Clearinghouse has a copy of this item.

Publication Types: News and Other Non-research Articles
Topics: Court Decisions; Crash Causes; Crash Reports; Motorcycle Safety; Pavement Dropoffs; Tort Liability

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute