Work Zone Safety Performance Measures Training Module (presentation)
Abstract:Introduces the concept of performance measures and performance data collection for work zone safety.
Modules Covered:
– What are performance measures?
– Why use performance measures for work zone safety?
– How to develop performance measures
– What makes a good performance goal?
– Sources for performance measures and goals
– How and when to measure performance
– Data collection techniques
– Lessons learned
Phase:
Planning
Design
Construction
Target Audience:
Planners, designers, construction engineers, and inspectors.
Format:
Selfpaced, presentation with speaker notes
Length:
30-45 minutes
Publication Date: 2011
Full Text URL: Link to URL
Cost: Free
For a hard copy, contact ATSSA, 540-368-1701, [email protected].
Topics: Data Collection; Performance Measurement; Work Zone Safety