• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Online Courses
    • FHWA Safety Grant Products
    • Toolboxes
    • Flagger
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • About
  • Events
  • Contact
  • Search
Publication

365-Day Sectional Work Zone Schedule Optimization for Road Networks Considering Economies of Scale and User Cost

Author/Presenter: Nakazato, Yuto; Mizutani, Daijiro
Abstract:

This study proposes a methodology for deriving the optimal work zone schedule for the annual routine maintenance planning in an infrastructure asset management system considering the (i) economies of scale in work zone costs due to work zone synchronization and (ii) user costs across the road network with traffic assignments. A key aspect of the proposed methodology is the ability to derive in detail optimal work zone schedules of realistic-scale road networks in 100 m sections for 365 days, which is beneficial in practice. To this end, an optimization model of the work zone schedule is newly formulated as a mixed-integer programming (MIP) problem, and a novel bilevel solution method for the model utilizing the conventional solver Gurobi Optimizer with MIP algorithms such as root relaxation, dual simplex, barrier methods, and cutting planes is proposed. In application examples, the proposed methodology is applied to two real-world road networks, which confirms that the optimal work zone schedule can be obtained in 313.7 s for a network with 2640, 100 m, sections and in 168,180 s (46 h and 43 min) for a network with 5038, 100 m, sections.

Source: Computer-Aided Civil and Infrastructure Engineering
Volume: 39
Issue: 15
Publication Date: June 2024
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Construction Scheduling; Costs; Work Zones

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute