Analysis of Loss of Time Value During Road Maintenance Project
Author/Presenter: Sudarsana, Dewa Ketut; Sanjaya, Putu AriAbstract:
Lane closure is frequently performed in the execution of the road maintenance project. It has a negative impact on road users such as the loss of vehicle operating costs and the loss of time value. Nevertheless, analysis on loss of time value in Indonesia has not been carried out. The parameter of time value for the road users was the minimum wage city/region approach. Vehicle speed of pre-construction was obtained by observation, while the speed during the road maintenance project was predicted by the speed of the pre-construction by multiplying it with the speed adjustment factor. In the case of execution of the national road maintenance project in the two-lane two-way urban and interurban road types in the fiscal year of 2015 in Bali province, the loss of time value was at the average of IDR 12,789,000/day/link road. The relationship of traffic volume and loss of time value of the road users was obtained by a logarithm model.
Source: AIP Conference Proceedings
Volume: 1855
Issue: 1
Publisher: AIP Publishing
Publication Date: June 2017
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Costs; Highway Maintenance; Impacts; Lane Closure; Mathematical Models; Traffic Delays
Volume: 1855
Issue: 1
Publisher: AIP Publishing
Publication Date: June 2017
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Costs; Highway Maintenance; Impacts; Lane Closure; Mathematical Models; Traffic Delays