• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Join Listserv
  • Contact
  • Twitter
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Transportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Flagger
    • Online Courses
    • Toolboxes
    • FHWA Safety Grant Products
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
    • COVID-19 Guidance
  • Public Awareness
  • Events
  • About
  • Listserv
  • Contact
  • Search
Publication

Analysis of Loss of Time Value During Road Maintenance Project

Author/Presenter: Sudarsana, Dewa Ketut; Sanjaya, Putu Ari
Abstract:
Lane closure is frequently performed in the execution of the road maintenance project. It has a negative impact on road users such as the loss of vehicle operating costs and the loss of time value. Nevertheless, analysis on loss of time value in Indonesia has not been carried out. The parameter of time value for the road users was the minimum wage city/region approach. Vehicle speed of pre-construction was obtained by observation, while the speed during the road maintenance project was predicted by the speed of the pre-construction by multiplying it with the speed adjustment factor. In the case of execution of the national road maintenance project in the two-lane two-way urban and interurban road types in the fiscal year of 2015 in Bali province, the loss of time value was at the average of IDR 12,789,000/day/link road. The relationship of traffic volume and loss of time value of the road users was obtained by a logarithm model.
Source: AIP Conference Proceedings
Volume: 1855
Issue: 1
Publisher: AIP Publishing
Publication Date: 2017
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Costs; Highway Maintenance; Impacts; Lane Closure; Mathematical Models; Traffic Delays

Copyright © 2023 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute