• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Flagger
    • Online Courses
    • Toolboxes
    • FHWA Safety Grant Products
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • Events
  • About
  • Contact
  • Search
Publication

The Influence of Project Bundling on Maintenance of Traffic (MOT) Costs Across Highway Project Types

Author/Presenter: Qiao, Yu; Fricker, Jon D; Labi, Samuel
Abstract:

Maintenance of traffic (MOT) is the process of providing transportation management and traffic control at highway work zones. MOT work is an essential part of any construction project and can constitute a significant fraction of overall project cost. It is hypothesized that MOT costs can be reduced significantly through project bundling (consolidation of several separate projects into a single contract). There seems to exist a lack of documented evidence regarding the impact of bundling on MOT costs. In addressing the issue, this paper develops statistical MOT cost models that take into account the effects of bundling and other influential factors. The paper considered six (6) construction work categories that involve thirty-six (36) different project types. Several significant variables were identified including the project cost, bundle size, geographical proximity, functional class, traffic volume, and letting season. The impacts of these factors on MOT cost were found to vary significantly across the different project types. The study results can provide highway agency construction managers with knowledge on which specific attributes of a project could lead to significantly reduced MOT cost if the project were bundled, and those for which bundling would likely have no such benefits.

Source: Transportation Research Board 98th Annual Meeting, January 13-17, 2019, Washington DC
Publisher: Transportation Research Board
Publication Date: 2019
Source URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Costs; Road Construction; Temporary Traffic Control; Work Zones

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute