• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Online Courses
    • FHWA Safety Grant Products
    • Toolboxes
    • Flagger
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • About
  • Events
  • Contact
  • Search
Publication

Time-Dependent Transportation Network Design Considering Construction Impact

Author/Presenter: He, Yi; Song, Ziqi; Zhang, Lihui
Abstract:

A traditional discrete network design problem (DNDP) always assumes transportation infrastructure projects to be one-time events and ignores travelers’ delays caused by construction work. In fact, infrastructure construction usually lasts for a long time, and the impact on traffic can be substantial. In this paper, we introduce time dimension into the traditional DNDP to explicitly consider the impact of road construction and adopt an overtime policy to add flexibility to construction duration. We address the problem of selecting road-widening projects in an urban network, determining the optimal link capacity, and designing the schedule of the selected projects simultaneously. A time-dependent DNDP (T-DNDP) model is developed with the objective of minimizing total weighted net user cost during the entire planning horizon. An active-set algorithm is applied to solve the model. A simple example network is first utilized to demonstrate the necessity of considering the construction process in T-DNDP and to illustrate the tradeoff between the construction impact and the benefit realized through capacity extension. We also solve the T-DNDP model with data from the Sioux Falls network, which contains 24 nodes, 76 links, and 528 origin-destination (O-D) pairs. Computational results for the problem are also presented.

Source: Journal of Advanced Transportation
Publication Date: January 2018
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Construction Scheduling; Highway Capacity; Highway Design; Impacts; Mathematical Models; Road Construction

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer