• Skip to primary navigation
  • Skip to main content
Logo

Work Zone Safety Information Clearinghouse

Library of Resources to Improve Roadway Work Zone Safety for All Roadway Users

  • About
  • Newsletter
  • Contact
  • X
  • Facebook
  • LinkedIn
  • Work Zone Data
    • At a Glance
    • National & State Traffic Data
    • Work Zone Traffic Crash Trends and Statistics
    • Worker Fatalities and Injuries at Road Construction Sites
  • Topics of Interest
    • Commercial Motor Vehicle Safety
    • Smart Work Zones
    • Work Zone Safety and MobilityTransportation Management Plans
    • Accommodating Pedestrians
    • Worker Safety and Welfare
    • Project Coordination in Work Zones
  • Training
    • Online Courses
    • FHWA Safety Grant Products
    • Toolboxes
    • Flagger
    • Certification and
      Accreditation
  • Work Zone Devices
  • Laws, Standards & Policies
  • Public Awareness
  • About
  • Events
  • Contact
  • Search
Publication

Capacity of Freeway Work Zones in Germany

Author/Presenter: Von der Heidena, Nina; Geistefeldt, Justin
Abstract:

Work zones considerably influence the traffic flow quality on freeways. In work zones, the capacity can be significantly reduced due to narrower lanes, a reduced number of traffic lanes, and unfavorable roadway geometry. In order to evaluate the impact of work zones on congestion occurrence and resulting delays as well as to allow for a consideration of alternative work zone layouts in the planning process, models to estimate the capacity of work zones are required. The paper presents results from a comprehensive study of work zone capacity on German freeways. In the analysis, a large number of short-term work zones with temporary lane closures as well as long-time work zones with and without a reduction of the number of lanes were covered. Data from loop or radar detectors upstream of the work zones were analyzed. For the capacity estimation of long-term work zones, both deterministic and stochastic approaches were used. In contrast to long-term work zones, traffic flow data measured at short-term work zones include only one traffic breakdown observation in most cases. This breakdown often occurs immediately after the lane closure, which means that the pre-breakdown volume does not represent the capacity of the work zone. Hence, valid capacity estimates could only be determined for the post-breakdown congestion outflow. The estimated capacities were analyzed regarding the influence of the traffic, geometric and control conditions in the work zone. Relevant parameters are the number of lanes, the lane widths, the existence of divided lanes, the existence of a lane reduction as well as the share of commuters and heavy vehicles. For short-time work zones, also the side of the lane closure (left or right lane) has an influence on the capacity. As a result of the study, capacity estimation models for both short- and long-term work zones, which can be applied in work zone planning procedures, are provided.

Source: Transportation Research Procedia
Volume: 15
Publication Date: 2016
Full Text URL: Link to URL
Publication Types: Books, Reports, Papers, and Research Articles
Topics: Lane Closure; Work Zone Capacity; Work Zones

Copyright © 2025 American Road & Transportation Builders Association (ARTBA). The National Work Zone Safety Information Clearinghouse is a project of the ARTBA Transportation Development Foundation. It is operated in cooperation with the U.S. Federal Highway Administration and Texas A&M Transportation Institute. | Copyright Statement · Privacy Policy · Disclaimer
American Road and Transportation Builders Association Transportation Development Foundation, American Road and Transportation Builders Association U.S. Department of Transportation Federal Highway Administration Texas A&M Transportation Institute